Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |Pусский |
| No.13688725

- Product Categories
- Friendly Links
- home > Supply > Anshun mortar spraying machine | Wall spraying machine | sprayer factory direct - Wanda Machinery
Information Name: | Anshun mortar spraying machine | Wall spraying machine | sprayer factory direct - Wanda Machinery |
Published: | 2015-04-04 |
Validity: | 180 |
Specifications: | |
Quantity: | 300.00 |
Price Description: | |
Detailed Product Description: | Mortar spraying machine basic parameters: Model: WD-3000 Power Supply power 400V 50Hz Motor Power Motor power 3.3 / 4 3.7 / 4.4KW maximum particle size Maximum grain size 5mm displacement Output 30L / min delivery pressure Delivery pressure 30bar level of transmission distance Horizontal delivery distance 60m vertical conveying distance Vertical delivery distance 20m Power Mixer power 1.1kw mixer mixer Mixer volume 120L capacity hopper capacity Hopper volume 100L Weight Net weight 280kg Dimensions Dimension (L × W × H) 1650 * 700 * 1140mm Note: The above data is only as a reference, the difference between physical and chemical properties due to the choice of the mortar, the value of their produce is not the same. Manufacturers Phone: 1 3 9 3 8 2 2 7 7 6 9 QQ: 1 0 4 4 5 1 9 1 9 6 mortar spraying machine before operating rules 1. Boot to add water into the hopper, adjust the speed to high speed, in order to achieve the effect of running wet pipe, only a short run, and then the water drained. 2. Stir the material into the hopper, and then spraying with the host pipe and nozzle exit lock. 3. Before opening the spray, the first red gas pump phoenix to 8kg pressure (match phoenix pump 0.26-0.36m) and then connected to the nozzle. 4. Turn on the power to the hopper at gunpoint, to adjust the amount of pressure and speed, speed, in order to achieve optimum atomization far, kept stopping the wind. 5. When debugging accurate nozzle and throat immediately moved to the construction site work. 6. the construction process, the pipeline is full of paint, not suitable for stopping too long, if the power outage, you should immediately dismantle pipe cleaning. 7. If a pressurized pipe, tube cleaning before the demolition, must cover with a cloth, to protect their eyes to avoid injury. 8. If the boot fails, first check whether the burned drill should be replaced immediately. 9. When the cleaning work or completion of the body, should not be water wet the drill or electric box to avoid damage. 10. After work each day, you should clean the hopper, pipes, nozzles, nozzle and rotary joints, must be cleaned thoroughly conducive working 11 tomorrow. If after a period of long working hours, did not notice the paint export power, we have to replace the pressure pump. 12 Suddenly do not send materials at work, and the motor is still working to prove that the nozzle has a plug hole, should immediately stop cleaning nozzle, and then continue working. 13. The nozzle is a loss (including the changing pressure pumping) standard nozzle hole is 4mm, and atomizing nozzle hole is not ideal when you want to replace the nozzle immediately. |
Admin>>>
You are the 7319 visitor
Copyright © GuangDong ICP No. 10089450, Mengzhou Wanda mechanical technology equipment Development Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 7319 visitor
Copyright © GuangDong ICP No. 10089450, Mengzhou Wanda mechanical technology equipment Development Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility